TERMINAL B TENANT IMPROVEMENTS
EAST ELMHURST, NEW YORK

The project consists of the fit-out of base building shell space (approximately 45,000 SF) in the LaGuardia Airport New Concourse B for airline operational space. The spaces are located on the ramp level of Concourse B. The space includes operational offices, employee spaces, workshops, storage areas and other support functions.

The following is the program breakdown:

Group A

American Airlines 5,000 NSF
United Airlines 8,400 NSF
Southwest Airlines 6,940 NSF
Jet Blue 4,200 NSF
Air Canada 2,360 NSF
Total: 26,900 NSF

The following carriers are to be relocated to the concourse B to facilitate construction phasing from September 2018 to July 2022.

Group B

Virgin American 2,000 NSF
Spirit Airlines 1,500 NSF
Frontier Airlines 400 NSF
Total: 3,900 NSF

Electrical system design included lighting and power distribution system for offices, IT rooms, men’s and women’s restrooms, new workstations, and storage and support areas, relocation of electric rooms, and revision of base building fire alarm system drawings.

Plumbing system design included men’s and women’s restrooms and piping associated with the fit-out of break rooms, janitor closets and maintenance spaces for multiple airlines tenant space. Local instantaneous electric hot water heaters were provided for single fixtures and electric storage type hot water heaters with recirculation pumps for multiple fixtures. All sanitary and vent piping were connected directly to the base building systems.

Client

Port Authority of NY & NJ

Architect

Graf & Lewent Architects

Area

35,500 SF

Services

Electrical Engineering
Plumbing Engineering

Construction Cost

$7 Million

Completion Date

2022

CLIENT REFERENCE

Mr. Howard Graf, AIA
Project Manager
Graf & Lewent Architects
90-30 161st Street
Jamaica, NY 11432
(718) 651-6200