NETWORK ORIGINATION CENTER & POST PRODUCTION CENTER
The Network Origination Center & Post Production Center, approximately 50,000 SF, consisted of a 20,000 SF network origination center (transmission center) and post production studio that is operational 24 hours, 20,000 SF of support spaces, and a 10,000 SF media library.
Mechanical system design included a 350-ton cooling tower plant, and four custom-built packaged air handling units supplementing two existing systems. The design provides redundancy for equipment and systems supporting the technical areas; and humidification for all technical areas and library. The mechanical systems were designed to provide NC 20-25 acoustical rating for the various technical areas. A complete DDC automation system monitors the physical plant.
Electrical system design configuration included a 600 KVA UPS with maintenance bypass and 30-minute battery backup for the entire technical load. A 1250 KW emergency generator serves the technical load as well as the air conditioning for the technical areas. The electrical systems also included a new 2,000 amp service to the floor. A complete grounding system was provided for the broadcast equipment.
Fire detection system design included a dry sprinkler system for the technical areas and a wet sprinkler system for the non-technical areas. There are three levels of smoke detection: below the raised floor, at the ceiling level and above the ceiling level, all with a state-of-the-art addressable system.
Client
Architect
Area
Services
Electrical Engineering
Plumbing Engineering
Fire Protection Engineering
Construction Cost
Completion Date
CLIENT REFERENCE
Principal
Hans Knutzen Associates
11 Prall Place
Nyack, NY 10960
(845) 358-7667